The Moresnet bridge on the line from Aachen West to Montzen and Visé seen from the south side on 21 June 2003. Currently the bridge is being renewed. A new segment is brought to the construction site. It is supported by bogies running on both tracks, two railway cranes running side by side are pushing. The columns of the red gantry will be lowered onto the pillars later to support the segment, then the train can be removed. After cutting the old segment and winching it down, the new one can be put into place. The part of the bridge the train is passing at the moment was already renewed.

Digital photo by Christoph Schmitz