Tracks at the border station of Quévy, South end, looking South (France).
• Right: Tracks 1-2, variable-voltage (Belgian 3kV DC + French 25kV-50Hz AC). The siding to the buffer is only in 3kV DC, though.
• Middle: Tracks 3-4, single-voltage (French 25kV-50Hz AC at this stage).
• Further left: sidings, all single-voltage (Belgian 3kV DC at this stage).
Quévy [Quévy-Frontière].
1st October 2006.
P.L.Guillemin (plguillemin@yahoo.fr)