Furka-Bergstrecke: Muttbach-Belvédère ---> Gletsch.

Pic looking East (Furka Tunnel and Realp).

At this stage, the line runs through a new alignment (964m), built in 1996/1998, so as to remove the cog-rail at the level-crossing for the Furka Road.

24th August 2007.

P.L.Guillemin (plguillemin@yahoo.fr)