Furka-Bergstrecke: Muttbach-Belvédère ---> Gletsch.
Pic looking East (Furka Tunnel and Realp).
At this stage, the line crosses the Furka Road, through a new alignment (964m), built in 1996/1998, so as to remove the cog-rail at this level-crossing.
24th August 2007.
P.L.Guillemin (plguillemin@yahoo.fr)