TPC - Switzerland
After reconstruction of the AOMC line (higher overhead line voltage, Abt rack system)
new rack-and-adhesion trainsets built by Stadler were introduced in October 2016.
Trainset Beh 2/6 nr. 546 is seen stabled at end station Champéry, for rush hour
duties and/or spare.
Champéry, 03-01-2017
Digital photo by Marco van Uden