TPC - Switzerland
After reconstruction of the AOMC line (higher overhead line voltage, Abt rack system) new rack-and-adhesion trainsets built by Stadler were introduced in October 2016.
Trainset Beh 2/6 nr. 547 is waiting for its departure time, for a run towards Aigle.
Champéry, 03-01-2017

Digital photo by Marco van Uden