TPC - Switzerland
After reconstruction of the AOMC line (higher overhead line voltage, Abt rack system)
new rack-and-adhesion trainsets built by Stadler were introduced in October 2016.
Interior of trainset Beh 2/6 nr. 547 on its way from Aigle towards Champéry.
Champéry, 03-01-2017
Digital photo by Marco van Uden