The second narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from east on 23 August 2001. A new bridge which will cross all four tracks is built. The old bridge which crosses the two old tracks is behind it. Note that at the new bridge there is no pillar in the middle and the pillars are some meters away from the tracks, this should prevent that a derailed train destroys the bridge like it happened in Eschede.

Digital photo by Christoph Schmitz