The small tunnel crossing the upgraded line Cologne-Düren (ABS 4) east of the Erfttalstraße near Sindorf seen from the south side on 20 May 2002. Under the highspeed tracks in the background the tunnel is already finished. In the past, the old line passed in the foreground on a steel bridge. While it is out of service, the tracks are removed here to build the new tunnel. Soon an outer shell will be installed, then the room between them (where the steel rods are already present) will be filled with concrete to form the walls and the ceiling.
Digital photo by Christoph Schmitz