The excavation for the new underground station Bonner Wall in the south of Cologne, seen from the northern end on 18 March 2006. On the right in the background the pit extends to a ramp leading to the end station Marktstraße, which is located on the surface. On the left, where the sheet pile wall is visible, another ramp towards the bank of the Rhine will be built. Trams of line 16 will use it to reach the old course of the Rheinuferbahn north of the stop Schönhauserstraße, while those of lines 5 and 17 will travel to the Marktstraße. This excavation also is the starting pit for the two tunnel drilling machines, which will drill two tubes (one for each track) from here to a place near the main station. Most of the excavation is covered to allow the surface traffic to flow unobstructedly (more or less). The startup of the new underground line is planned for 2010.

Digital photo by Christoph Schmitz (christoph.schmitz2@post.rwth-aachen.de)