The tail modules of the tunneling machine "Tosca", which will drill the eastern tube of the new underground line, seen from the rear end on 22 April 2006. These modules contain several devices neccessary for the operation of the machine, for example slurry pumps for the bentonite suspension, the segment magazine and ventilation pipes. The modules wheels are tilted, as they will run on the segmental lining. The narrow gauge train which brings the concrete segments enters the modules on the lower level.
Digital photo by Christoph Schmitz (christoph.schmitz2@post.rwth-aachen.de)