Catenary works in Horrem (on Cologne-Aachen) on 16 December 2001. The catenary is built while the track is still partly missing. So the work train with the drums of wire is parked at the end of the track, and the contact wire is pulled into place by this skylift operating from another track. The overview shows the tire-based skylift standing on a flatcar. It is moved by a dual mode excavator hidden by the bridge.
Digital photo by Christoph Schmitz