Southern Portal for the Marseilles HSL Tunnel (7,836 m, the longest French domestic railway tunnel).
At this stage, HSL tracks are already under 25kV-50Hz AC. Conversely, adjacent conventional tracks (1 on each side) feature 1.5kV DC.
Marseilles (Tuileries Jct).
29th January 2005.
P.L.Guillemin (plguillemin@yahoo.fr)