Two Thameslink EMUs with 319-184 in the rear (25kV AC overhead and 750V DC third rail) in Network South East and Thameslink liveries depart Herne Hill for Sutton using DC power on 28 May 1996. Copyright Pat & David Othen (dothen@ra.isisnet.com)