Photoraphed at Dorchester South on 24 September 2003 this Desiro unit shows the modular construction which means that 25kV O/H equipment can be added at a later date if required. Copyright belongs to author who can be emailed at ecml@yahoo.co.uk. Photograph taken on Canon EOS 10D