These are the approaches to London St. Pancras as they were during Easter. The two tracks seen to the left are not electrified as they lead to platforms 8 and 9 which Midland Mainline are using as a result of the blockade which, by the time you read this, will have finished. Soon platforms 8 and 9 will be decommisioned and undergo remodelling to international gauge standards. Picture taken: 26th March 2005 Author: Edward Sloley E-mail address: edward.sloley@ntlworld.com