Ashford International Station. From Left to Right: CTRL (2 tracks, 25kV AC catenary only), where services that do not call at Ashford International run at 300kph-186mph, and the Station of Ashford International, with 4 in 6 tracks electrified in 25kV AC (overhead) and 750V DC (live rail), and the Station Building, operated by Eurostar UK. Ltd.
CTRL through tracks emerge here from the cut and cover towards the flyover above the Ashford-Ramsgate line which one can see further away.
14th September 2003. P.L.Guillemin (plguillemin@yahoo.fr)